
PJM Capacity Auction Results 2027/2028: What C&I Facilities Need to Know
PJM's 2027/2028 Base Residual Auction cleared at the maximum price for the second consecutive year.

On December 5, 2025, ERCOT will launch Real-Time Co-Optimization + Batteries (RTC + B), its most significant market redesign since 2010. This initiative will integrate energy and ancillary services in real time, rewarding customers who can respond quickly to changing grid conditions.
Texas is growing fast. ERCOT forecasts demand will rise by 43 GW by 2030. The rapid expansion of AI, electrification, and digital infrastructure is pushing the grid to its limits, driving price fluctuation and reliability concerns.
On December 5, 2025, ERCOT will launch Real-Time Co-Optimization + Batteries (RTC + B), its most significant market redesign since 2010. This initiative will integrate energy and ancillary services in real time, rewarding customers who can respond quickly to changing grid conditions.
Before: Ancillary services were scheduled a day in advance. If your facility’s load changed unexpectedly, you faced penalties and missed opportunities.
After RTC+B: ERCOT will co-optimize energy and ancillary services every few seconds, unlocking over $1 billion in annual efficiency gains and enhancing participation for flexible loads and batteries by removing risk of steep penalties.
Under RTC+B, your facility can:
The future of ERCOT is flexible and fast. Voltus has the technology to optimize your participation and turn your facility into a reliable revenue-producing grid asset.
Ready to learn how? Contact info@voltus.co or reach out directly to cstack@voltus.co.